Previous Page  447 / 540 Next Page
Information
Show Menu
Previous Page 447 / 540 Next Page
Page Background

THE ITALIAN LEGACY IN THE DOMINICAN REPUBLIC

446

PC Ecological Foundation

Ecological Foundation constitution established

1990

Nature trails created

1992

Fruit tree garden established

1995

Biodiversity Center built

2000

Vegetable nursery

2003

Apiary

2008

Worm compost

2008

Puntacana Foundation

Politécnico Ann & Ted Kheel constructed

2004

Clínica Verón Reopened

2006

Clinic’s water filtration system installed

2008

National Police Headquarters built

2009

Street access to Barrio Nueva Esperanza & Villa Plywood

2009

Verón Elementary children’s park built (con VTech)

2009

PLS

Start of operations

2007

Corporación Aeroportuaria del Este (Eastern Airport Corporation, Cae)

Airport open to the public

1984

5000’ runway, terminal, and ramp built (fits two ATR planes)

First airport expansion

1987

Runway expanded to 7,500’

Second airport expansion

1990

Runway expanded to 9,000’, ramp extended to four spaces and terminal

expansion built (fits two planes, one for arrivals and one for departures)

Third airport expansion

1996

Runway rehabilitation and re-pavement

Fourth airport expansion

1998-99

Runway extended to 10,150’. ECO taxiway built. Ramp extended

by two spaces; ramp hydrant system built. Fuel station built.

Terminal repairs post-hurricane (90%), SSEI first stage.

Fifth airport expansion

2003

Exit terminal II built. FBO (currently VIP area) and FBO ramp built.

Customs expansion built. ECO-3 taxiway built. Check-in area expansion

(20 additional service counters) built.