General Development:

Verón-Punta Cana highway construction begins (Built in 1975-76 by

the Balaguer administration, allowing Club Med to be built in 1978,

followed by the airport in 1982)

CAE-Marina road pavement

1995

CAE-Marina road light post installation

1998

Construction of tourist and service entry points

2008

Puntacana Shopping Mall

First stage of PCSM construction

2008

Industrial Zone

First stage of industrial zone construction

2007

Guardianes del Este

First guard post constructed

1999

CAE garrison built

2007

Second guard station built

2008

Phase I of surveillance center

2009

CTSPC, S.A

1. Electrical Infrastructure

Until 1998, the hotel’s electrical grid was made up of three 500kW Caterpillar

generators located within the hotel itself and an additional 500kW generator

located in the CAE.

First power station built (phase I, 5MW EMD Generator)

1998

First distribution lines built

1998

Power station expansion

(additional 5MW EMD Generator)

2000

Power station expansion (external 5MW CAT Generator)

2003

Second power station built (7MWWärtsilä generator)

2005

Additional distribution lines built

2005

CEPM connection built (substation)